Asuncion Airport (ASU)
Asuncion Airport (ASU), Silvio Pettirossi, is the main terminal of Paraguay, and the aviation authority DINAC opened its new departure area in November 2025: an extension of 2,245 m2 that widened the security control and the immigration area. The same works added two new boarding bridges, at the gates 1 and 4.
Morsilla Travel may earn a commission from its partners; it does not change the price you pay.
Updated 21 October 2026
The terminals at Asuncion Airport
The airport's own authority says the Silvio Pettirossi International Airport is the main terminal of the country, and that on 21 November 2025 it opened a new departure area: an extension of 2,245 m2 built on the old terrace, part of the Continuous Improvement Programme of the Direccion Nacional de Aeronautica Civil.
The security control area of the new sector went from two positions to four, and from 230 m2 to 880 m2, with room for 120 passengers in line instead of 30, and the immigration area went from four positions to five and from 135 m2 to 500 m2, with room for 100 passengers in line instead of 25.
Getting to and from Asuncion Airport
The old access to the departure area is closed for good, and the new work is now the only way in, so a family that leaves the terminal for a moment has to go back through the new hall.
The works also added two new telescopic passenger boarding bridges, at the gates 1 and 4, and the airport's authority is renewing the security checkpoint with LED lighting, new ceilings, air conditioning of the shared areas and modernised bathrooms.
What happens when you arrive at ASU
Keep your passport and any form you filled in on the plane with you the whole way, from the aircraft door to the exit.
On an international arrival you clear immigration, collect your bags and pass through customs. The authority says the controls will be reinforced with five e-gates, which check the identity of the passengers without the manual review of the documents.
Asuncion Airport with children
The new departure area was built to take the queues out of the airport: the security control now has room for 120 passengers in line and the immigration for 100, instead of 30 and 25, so a family with a small child has more room while it waits.
Keep the children's documents in your carry-on bag, and arrive with time for the line of the new security area, which is the only access to the departure hall now.
Plan your stop at Asuncion Airport
Terminals, airlines and arrival procedures change, so check with the airline and the airport's own site before you travel. And check with the embassy or consulate about the documents your family needs for the entry rules of every country on your route.
Sources
- Official news of DINAC, the Direccion Nacional de Aeronautica Civil of Paraguay, of 21 November 2025: the Silvio Pettirossi International Airport opened its new departure area, an extension of 2,245 m2 built on the old terrace, with the security control area (AVSEC) going from two to four positions and from 230 m2 to 880 m2, with capacity for 120 passengers in line instead of 30, the immigration area going from four to five positions and from 135 m2 to 500 m2, with capacity for 100 passengers in line instead of 25, the previous access closed for good, two new telescopic passenger boarding bridges at the gates 1 and 4, and the plan to install five e-gates the following year. — dinac.gov.py (checked 21 October 2026)
- Official page of the Direccion de Aeropuertos of the same authority, with the aerodrome documents of the Silvio Pettirossi International Airport, among them the declaration of its operational safety policy and the aerodrome manual and the emergency plan. — dinac.gov.py (checked 21 October 2026)
Frequently asked questions
What is new at Asuncion Airport (Silvio Pettirossi)?
The airport opened a new departure area on 21 November 2025, an extension of 2,245 m2 built on the old terrace, with a wider security control and immigration, two new boarding bridges at the gates 1 and 4, and the plan to install five e-gates the following year.
How much room is there now in the security and the immigration of Asuncion Airport?
The security control area went from two positions to four and from 230 m2 to 880 m2, with room for 120 passengers in line instead of 30, and the immigration area went from four positions to five and from 135 m2 to 500 m2, with room for 100 passengers in line instead of 25.
How do I get into the departure area of Asuncion Airport?
The old access is closed for good: the new work is the only access to the departure area, and it is reached through the new hall.
What changes for the families at Asuncion Airport?
The queues are shorter now: the security control has room for 120 passengers in line and the immigration for 100, instead of 30 and 25, and the e-gates that are coming do the identity check without the manual review of the documents.
What do I do first when I land at ASU?
Keep your passport and any form you filled in on the plane with you the whole way, clear immigration, collect your bags and pass through customs.